HPE Drill Guide
Supplier Information
Name:
HPE
Contact:
UlrichKienle
Phone:
0114621903
Email:
sales@hpesa.com
Website:
http://www.hpesa.com
Address:
19 Precision Street, , Kya Sand, Gauteng, 2163
The HDG consists of a rail, which connect to Camlock props and a boom containing a thrust cylinder, mounted on top. For stope applications, the rail and boom can drill all the holes in low stopes up to 1.4 m high, or by addition of a lift mechanism between the rail and the boom, the top holes can be reached in higher stopes up to 2 m height. The stope rails connect to the props close to the face through chains and hooks. For gully and raise applications, the pipe rail is connected to the props with hook plates that are fixed to the props. This allows vertical movement of the rail.
Equipment Type |
HPE Drill Guide |
---|---|
OEM |
HPE |
TRL |
TRL9 |
Mining Type |
Underground mining |
Mine Development |
Access Development,Stoping |
Mining Activity |
Drilling |
Mining Method |
Mechanised,Conventional |
Mineral |
Gold & Platinum,Diamonds,Base Metals |
Energy source |
Water hydraulic |
Logistics & materials handling |
|
ITComms |
|
reefType |
Massive,Narrow |
Good advances, due to accurate drilling | |
Minimum blast damage to the existing excavation | |
Minimum over-break | |
Excavations of the desired size | |
Minimum fragmented rock to be cleaned | |
Minimum narrowing/deterioration of the stope with time |